Stuart, 
US, 
FL
Hatteras

Change Order

$3349000

Model:  GT 59 Convertible
Year:  2021
Builder:  
Make:  Hatteras
Engine Power:  
Length:  17.98′
Beam:  18.75 ft
Draft:  4.75 ft
Engines:  2
Hull:  Fiberglass

 This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines.  The engines are still under warranty and warranty can be extended out further.  All service is up to date on engines and generators with records.  The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition.  Call to inquire for more information or schedule a showing on “Change Order” the 2021 HATTERAS 59’ CONVERTIBLE GT59. Engine warranty until 12/7/2025 or 2,000hrs.

 

HIGHLIGHTS

  • CAT C32A engines with warranty until 12/7/2025 or 2000 hours
  • 2022 Garmin electronics package
  • 4/2022 Electrosea system added
  • 4/2022 KVH tracvision 7 HD tv added
  • 4/2022 JL Audio system with speakers, subwoofer, and amplifiers added
  • Two generators
  • Mezzanine seating in cockpit
  • Air conditioned flybridge
  • Bow thruster
  • Water maker
  • Ice chipper
  • Underwater lights
  • Sirius/XM weather & radio

Interested In This Yacht?

Similar Yachts

Bridgetown, 
KY, 

Year:

2013

Length:

60 ft

Price:

$2199999
Azimut

S7

Miami, 
US, 
FL

Year:

2019

Length:

70.08 ft

Price:

$2700000
Maritimo

S62

B&B

Sidney, 
CA, 
BC

Year:

2015

Length:

68 ft

Price:

$1189000